Tax included and shipping calculated at checkout
Stop rereading. Start remembering.
An interactive digital study guide for The Crusades c.1095–1149, designed to help students learn the topic, test their memory and practise the exam.
Revision that makes students do something
Active Recall
Students recall information before revealing the answer.
Exam Practice
Practise the question types students will face in Component 1E.
Test Yourself
Questions, flashcards and matching games turn revision into active practice.
Track Progress
Mark sections complete and see what still needs attention.
Don't just read the answer. Try to remember it.
Knowing something while looking at a page is very different from being able to recall it when an exam question appears.
This study guide is built around active recall and self-testing. Students learn the material, attempt to retrieve it from memory, check their answer and then practise using that knowledge.
- 32 interactive flashcards
- Quick Match self-testing games
- Interactive timeline
- Test-yourself questions
- Five worked exam answers
- Examiner-style commentary
- Progress tracking
Knowing the history is only half the job.
Students also need to know how to use what they know. The guide connects the Crusades content with the five Component 1E question types.
What makes it different?
Inside the study guide
7 Core Sections
From the power of the papacy and the birth of the Crusading movement through to the First Crusade, Outremer, the Second Crusade and the wider effects of the Crusades.
32 Flashcards
Work through key terminology in sequence, filter cards by section or shuffle them into a random order.
5 Worked Answers
See realistic strong student answers alongside examiner-style commentary explaining what makes the response effective.
Master Timeline
Follow the chronology from 1046–1149 and filter the timeline by historical theme.
Test Yourself
Recall questions appear throughout the guide, with answers revealed only when the student is ready to check.
Top 20 Facts
A focused collection of essential facts, including an explanation of why each one can earn marks.
2 Bonus Richard the Lionheart Posters
Two downloadable PDF history posters are included with your purchase.
Alongside the interactive Crusades study guide, you also receive two Richard the Lionheart PDF posters.
- 2 separate downloadable PDF posters
- Print at home or school
- Useful for a bedroom, study space or classroom
- Included at no additional cost
Please note: the posters are digital PDF files. They are not physically posted.
Digital download. No waiting for the post.
This is a digital product, not a physical revision book. The main study guide is supplied as an interactive HTML file, with the two Richard the Lionheart posters supplied as downloadable PDF files.
Questions you may have
Is this a physical revision guide?
No. This is a digital download. The main study guide is an interactive HTML file and the two Richard the Lionheart posters are downloadable PDF files. Nothing is physically posted.
Is this just another PDF revision guide?
No. The main study guide is an interactive HTML file containing clickable flashcards, self-testing activities, matching games, an interactive timeline and progress tracking.
Is it specifically for Eduqas GCSE History?
Yes. It is written for students studying Eduqas GCSE History Component 1E: The Crusades c.1095–1149.
Is it an official Eduqas or WJEC publication?
No. It is an independent educational resource written for students studying the Eduqas specification. It is not affiliated with, endorsed by or produced by WJEC or Eduqas.
Will it guarantee a particular GCSE grade?
No revision resource can guarantee a particular grade. The guide is designed to encourage active recall, self-testing and exam practice so students can make better use of their revision time.
What exactly is included?
You receive the complete interactive HTML study guide, 32 interactive flashcards, self-testing games, an interactive timeline, seven core revision sections, five worked exam answers, test-yourself activities, a glossary, the Top 20 Facts You Must Know section, plus two bonus Richard the Lionheart PDF posters.
Learn it. Test it. Practise it. Remember it.
A focused digital revision resource for students studying Eduqas GCSE History Component 1E.
This is an independent educational resource. It is not affiliated with, endorsed by or produced by WJEC or Eduqas. Students should check the current specification and confirm examination requirements with their teacher.
